so, still smashing myself to bits in the garden

have now managed to complete getting power to the garage, sockets - that are fixed - working, two to complete, lighting going in, outside for the garden complete
also noticed AGAIN, that the guttering on the conservatory has a sag in it, so the water can't run off, have dropped the lot, re-arranged the placement of the clips and reset the gutter, now it is level, but where it turned the corner, it went UPHILL ffs, so off to B+Q fora spare corner unit, as dopey bollox here managed to break it ................
it is now in place and the run from the corner to the downpipe was removed, redrilled the brackets to lower them 1/4 of an inch, all back in place, just need it to rain to prove

won't have long to wait, this IS the UK after all

and still plodding along sorting the flag laying
one issue, I started off and allowed a bit of leeway in the bubble gauge, so NOW, there is a distinct SLOE in the feckers ffs

will have to go back, lift and relay several of them, and also sort the lining blocks too, which is a pain, as the blocks were laid on a dry concrete mix, so I could hammer the bastards flat, and the concrete could go off / harden to hold them in place ................
so yea, that
but the reality is that I am actually out here doing stuff, ME
and one day it will be done, I will probably drop dead in shock come that day, but hey ho
at least the garden will be done LOL
stay safe all